2015 February
This subject has 7 items assigned...
M/s Concepcion Interiors Pte Ltd was the main contractor for the above interior-work projects carried out for Sloane Clinic in the year of 2011 (for MBS) and 2013 (for CH & ION).
They had done a remarkable job in carrying out the interior work at SC-MBS in the year 2011. That was the first experience we had with them and they had illustrated professionalism throughout the entire project. As most of the work were to be carried out after office hours and on weekends to minimize disruption and inconvenience to existing tenants. The ability to organise the work is a testament to their administrative and site-organising capabilities. We are particularly pleased with their attention to details, site planning, prompt response, proper site supervision and good workmanship that commensurate with timely completion. With the satisfactory completion of SC-MBS, we have built up the confidence with them and we continued to embark on the second project at SC-CH and so on with our latest at SC-ION. They have, once and again, shown consistency in their quality service.
In summary, Concepcion has proven to be a responsible and reliable contractor. They have demonstrated a high degree of initiative in design problem-solving and in overcoming site constraints. It is just simply thumbs up for them and we would have no reservation in recommending to those who may require their quality service.
Dr Hardie Billy
Eastlife Pte Ltd (For The Sloane Clinic)
This letter of recommendation is to given to M/s Concepcion Interiors Pte Ltd in appreciation and recognition of their efforts involved in the proposal and execution of enhancement/ renovation project for Chevron Oronite office @ Jurong Island in the Phase 1 work.
The company was awarded as the main contractor for the above project. The Phase 1 work at level 1 commenced on 31 May 2014 and was completed on 30 September 2014. Currently, they are into the Phase 2 work at level 2of the project ans expected to completed by 31 December 2014.
The Company has done a remarkable job in carrying out the Phase 1 work as the project was fast pacing and required them to complete their work for the first floor within a stipulated time span. They have illustrated professionalism throughout the entire work with commitment in the design, project execution and completion. Their ability to organize the work is testament to their administrative and site organizing capabilities. In addition, we would like to commensurate the quality and service rendered throughout the process until it successful completion. With the consistency in their quality service, we have built up the confidence in them and know that they will not fail us in any aspects of the work for the on-going Phase 2 work of the project.
In summary, the company has proven to be a responsible and reliable contractor. They have demonstrated a high degree of initiative in design problem-solving and in overcoming site constraints. They are trustworthy and we would have no reservation in recommending to those who may require their quality service.
Mr. Teo Chu Laik
Project Engineer
Chevron Oronite Pte Ltd @ Jurong Island
” A job well done. Fantastic!!!”
Mr. Roger Tan
“Excellent service and managed to finish the project on time. God job!”
Ram Delli
Project Manager
Caterpillar Asia Pte Ltd
“Good, knowledgeable and experienced team leader and workers. Need improved on full time site contact with client and customer of any queries highlight.
Ms Majuri
M/s Design Worldwide Partnership
Project: IBM Singapore Pte Ltd (Level 7 & 8)
“William and Jack has a good team work and would prefer to work with them for my next project.”
Mr. Raymar Limbo
M/s Designphase DBA
Project: Bull & Butcher Restaurant
” Very good service always!!! Kudos to the Concepcion team.Keep up the good work and relationship.”